hey this is Johnny Cologne here with another episode of Master Craftsmen on this episode we're learning about elevators watch us next time you meet somebody in the construction trade shake their hand and tell them that you are in all why because it's those construction trades that make model like possible just think of how the elevator change the world buildings now grow taller and people with disabilities and the rest of us can effortlessly navigate upper floors this episode of Master Craftsmen follows Island elevator as they install a new elevator in the commercial building after seeing what
goes into building a functioning and safe elevator you'll never look at the machine or ride them without a sense of wonder we joined Island elevator once the elevator shaft was already framed according to the architectural drawings they were installing the rail brackets and the rail as straight and accurately as possible in the elevator shaft these rails just like those of a train except these run vertically up in the air if the rails are not perfectly aligned the elevator can go off the track and people can get hurt precision matters a professionally installed elevator starts with
precisely installed rail brackets every measurement needed to install every part on the elevator can be followed directly back to the bracket placement installation begins with the spot brackets at the topmost part of the shaft technicians drop a plumb line to the elevator pit in order to accurately line the lower brackets with the spots up top this plumb line is a steel wire with a 12 pound weight on the end to mitigate sway over long distances rail brackets must be perfectly straight levelled and aligned to a tolerance of one sixty-fourth of an inch every aspect of
the installation depends on perfect measurement perfect square perfect level position that we mean absolutely perfect they repeat the installation of the rail brackets from floor to floor inside site until all the brackets are in place once the brackets are in place the guide rails are attached guide rails are carefully guided in place with one ton chain hoist communication is key for safe installation guide choose study the elevator as it travels up and down the shaft upward motion is achieved when oil is pumped into the hydraulic Pistons causing them to raise the elevator lowers by releasing
the oil pressure in the system sensors monitor and ensure the Pistons on both sides of the shaft are moving in sync the selector is a device that monitors floor position it reads carefully position magnets on the selected taping commands the elevators stopped in a precise alignment with each floor during this phase the computerized motion control system is installed control jump is that bypass safety devices allow the installation of a temporary run box to move the platform while under construction the car sling installation constitutes the platform styles cross heads and both the channel it's a rugged
steel construction as the foundation on which the rest of the cabin passengers will ride our basic elevator template is now in place hey I'm here with Chris gutkas president of Island elevator Chris what tradesmen we're in here to install them rails and brackets in the other earlier tell me why was that a critical process the rails and brackets are imperative they're the foundation of the entire elevator installation if we don't put the brackets on properly then the rails will be off and every other item in the entire installation is set to the rail distance and
those items would be off also so precision is important they have to go ahead and make sure that these rail brackets between top to bottom of the shaft no matter how high it is is only off by no more than plus or minus one 64th of an inch this requires an extraordinary amount of precision and skill in order to make sure that no detail is lost while we try to install these items and then the brackets will lead us into the rails which will lead us into the rest of the installation it's the foundation of
everything that the elevator is built on comes back to the rest today you installed the cost as you prepare for temporary operations tell me more about that process well the car sling comes in pieces and it has to be put in both square and plumb in order for us to marry it up to the previously installed Pistons and rails if this process is not done perfectly then we're not going to be able to have a properly and safely running elevator as we go up and down the shaft in order to continue along our installation so
now you've restored the rails the platform and the sling what comes next we can start setting our entrances that's the doors that you would walk through when you enter an elevator under normal circumstances and all of these entrances will have to be plumb and square to the entire installation and be able to be measurable within a quarter of an inch back to the rails following that we'll install the cab and following that will be electrical work and programming of the elevator in order to get us to permanent operation sounds like there's a lot that goes
on it's rolling an elevator how many different trays and tradesmen do you use just for this job it's hard for me to even pinpoint there's the Masons there's the steelworkers there's the steamfitters there's the fire service vendors there's the electricians that play a big role in this part of being an elevator installer elevator constructor is knowing how to work within a team because we're going to have to be able to communicate very specific clearances and tolerances in order to make sure that this elevator fits in the shaft and works in conjunction with the other building
construction systems great information [Music] as installation continues precise measurements are taken to install the struts the struts guide the hold or installation at each landing brackets are installed the hole destruct securely in place when completed a full-speed elevator will zip past inches is at less than an inch so they must be installed perfectly to avoid a collision imperfect struts leads to poorly installed entrances and doors that don't work the hoist way sill is placed at the inches on each level the hoist way sill and the capsule must be in perfect alignment marks are made to
prepare for the installation of the door box a header is placed along the top of the entrance at each landing completing the frame of the door bug which can now be installed it is secured both top and bottom as always to strict and exact specifications now it's time to install the landing door the door rise on the landing header resting on smooth rolling casters it is kept in a track with the hoist still using guides known as Gibbs know how perfectly level and align the header and the hoist so are the door hangs and moves
with ease the Assembly of the cab begins by loosely joining the side and rear interior walls as they sit on top of the platform next our team unpacks the dome and ceiling units to finish off the top of the elevator these components contain electronics that will be wired into the rest of the system later the function problem before the dome is attached the strike column and return column are installed and the front panels of the car are assembled this includes the car operating station that contains the cars vital electronic command and control assembly it houses
a computer interface auxilary control key switches fire service operation and call registration buttons once that is in place the dome is attached the door control and motor drive unit resides atop the front of the cab and is joined to the front walls and the dome to structurally tie all panels together as always to precise measurements and specifications with cab assembly complete all parts are tightened double check for square and anchor to the platform in their final positions the cab door is now moved into place attached to the door operator and adjustments are made until the
door is running smoothly Gibbs will keep the cab door in line with the capsule the door clutch assembly is attached to the cab door and adjusted as the cab moves between floors the clutch will engage the outer doors on each landing and caused them to open and close and sync with the cab door when driven by the door operator the mechanism to lock and unlock the door at each floor is installed and adjusted for proper operation senses to reopen the door when instructed are installed the electrical wiring on top of the elevator for the lights
and ventilation fan is complete there are two types of wiring involved in an elevator installation the higher voltage electric wiring that powers the various electric systems and the complex low voltage signal wiring that runs between the computer and the various devices and sensors wiring of the computer and control systems runs along a cable comprised of hundreds of wires and completing these connections now make up the bulk of what's left on the job the crew will field wire all remaining car control systems remove some of the jumpers that override computer control and finally remove the run
box that has been controlling the elevator for most of this installation the crew now controls the elevator from the inspection station on top of the car as the name indicates they will do a complete inspection of all the elements on the inside of the shaft verifying Co compliant operation as they go minor adjustments with door latches and sensors are corrected or repaired before moving on after controller wiring is completed one team member will operate the elevator for the control room while another checks elevator speeds they fine-tune the speeds by adjusting the valves which control the
rate at which hydraulic fluid is allowed into and out of the piston until the speed is complying with engineer specifications and elevator code the remainder of the field wiring for the control systems is completed every button switch and end point in the system is now connected there are literally hundreds wiring at the control and microprocessor wiring for the buttons and switches at the various floor landing core stations and of course all the connections to the control board on the car wires fixed to the non-moving systems are carried through solid conduit while wires that move with
the car are carried via traveling cable once all the wiring is completed the computer is programmed with various command and control protocols required for the proper operation the elevator is turned over to full automatic control finally every button switch and system on this elevator install is tested to make sure it is functioning properly to code door safety sensors are checked to make sure they open if the light curtain is interrupted fire safety systems are checked to make sure that the elevator recalls to the proper floors in case of an emergency once all of this is
confirmed and any discrepancy is corrected the elevator is essentially completed all that's really left is some tidying up and painting completing a professional installation we're back here with Chris from Milan elevated how's it going Chris very good thank you okay we just witnessed this project being completed but before you your client could use it he had a pass an inspection tell us more about that process well the first step is to make sure that we scheduled the inspection with a certified elevator inspector that's recognized by the authority having jurisdiction in this particular municipality that elevator
Spector is going to step through and conduct a over 150-point test that's going to include every single electronic device every single safety device and every single scenario that may or may not encounter the elevator plus the passenger over the course or the lifetime of the equipment to include that as a full load weight test to make sure that the elevator not only stops at the floor but floor level doors open and people can exit and enter safely we saw all kinds of skills go into completing this project how did those skills affect the passing of
the inspection well obviously if everything doesn't go in correctly then we don't have a working elevator to even inspect our carpentry skills make sure that everything goes in straight plumb and level our electronic skills and wiring skills make sure that all of the switches circuits and buttons work as they were intended to plumbing make sure that a leak free transfer of that high-pressure system goes from the power unit into the Pistons carrying the elevator up and computer programming skills to train the brain of the elevator and have it act as we expect it to on
a daily basis thanks a lot for having us Chris thanks a lot for coming great job [Music] we have seen some highly skilled craftsmen on this episode their skill in training make model like possible not to mention safe join us next time when we highlight many other skilled craftsmen and how their skills make our lives better I'm Gianni Kunal and I'll see you next time on NASA craftsman until then let's keep building [Music] Master Craftsmen is sponsored by Percy jobs and careers and here's why globalization and technology have caused high levels of income inequality unskilled
workers suffered the most lack of skills is the primary cause of income inequality and is disrupting the construction industry spending on infrastructure is surging but lack of skilled workers has hindered growth push projects over budget and schedule jeopardizing quality and safety apprenticeship training transforms unskilled workers into skilled crafts persons yet in the recent decades such on-the-job training coupled with the related classroom instruction has been in decline apprenticeship training will reverse widening income inequality and create a ready pool of skilled trades persons at Percy we can train thousands of apprentices by using workplace safety programs on